Meeting Minutes for July 16, 2020
Meeting Location: NHDOT Commissioner’s Conference Room/Zoom
Day/Time: Thursday (8:00 am – 9:00am)
In attendance:
Bill Oldenburg, NHDOT (Chair)
Mike Long, MJ
Ted Kitsis, NHDOT
Alex Koutroubas, ACEC
Michelle Marshall, FHWA
Chris Mulleavey, HTA
Rob Faulkner, CHA
Darren Blood, GM2
Keith Cota, NHDOT
Marty Kennedy, VHB (Scribe)
Loretta Girard Doughty, NHDOT
Jim Marshall, NHDOT
CR Willeke, NHDOT
- Meeting Minutes: The meeting minutes from the last meeting were accepted.
- Assigned Scribe for Meeting: (DOT even months/ACEC odd months) – Marty Kennedy
- Topics for Discussion:
- COVID-19 Contract Addendum Language
- The Department had begun distributing a Special Contract Provision for
COVID-19 that states that any disruption, delay, or other impact associated
with COVID-19 was foreseeable and therefore does not excuse the
Consultant’s performance under the agreement. - Bill explained that language came directly from the AG’s office. This was
primarily about contractors suppling goods to the state, but the term
“Consultant” was inserted into the document. - Consultants’ concern is that although the language protects the state, it does
not protect the consultant. The language puts the consultant in a position of
being responsible for meeting a schedule regardless of whether the
Governor was to invoke a workplace shutdown order. - Bill agreed language was one-sided and agreed to take concerns back to
AG’s office. - More discussion on this to come.
- The Department had begun distributing a Special Contract Provision for
- Discuss SW Cole Question – Geotech sub that does Design and CE&I on same project
- Regarding the Department’s policy that the same firm can not do both the
design work and the construction inspection on the same project, SW Cole
asked the Department if that policy pertained to subs. - Following some discussion, Bill felt that it was permissible for a
subconsultant to do work on both the design and CE&I as long as they
where overseen by someone else – the Prime.
- Regarding the Department’s policy that the same firm can not do both the
- CE&I Field Rate
- Following up on a discussion from last month’s meeting on whether a field
overhead rate must be used for construction inspection, Bill checked with
Audit. Doesn’t appear to be a major issue. There was some discussion that
an office rate can be used if there was no field office or if the inspector
regularly works out of the consultant’s regular office. Most use office rate
now.
- Following up on a discussion from last month’s meeting on whether a field
- Construction Services – Part C Agreement?
- Under Part A consultant’s surveyor records existing ROW. Under Part B
consultant’s surveyor prepares acquisition plans. How does the Department
pay the consultant to place bounds when it can be many years later until the
work is done? - Currently there is no opportunity for the designer to assist or respond to
questions if an issue arises. - May consider an on-call for PE at beginning of Part C that would cover
survey, shop drawing reviews, etc.
- Under Part A consultant’s surveyor records existing ROW. Under Part B
- COVID-19 Contract Addendum Language
- Next Meeting: Discussed changing the day of our monthly meeting because Bill has
another regular 9:00 am meeting and our meetings always get cut short and we rarely get
through all agenda items. Following the meeting, the date of our regular meetings was
changed to the 3rd Friday of the month at 1:00 pm. Our next meeting is scheduled for
Friday August 21st.