Innovation, Teamwork and a 4 Day Closure–Bunker Creek Bridge

The Design-Build (DB) team of builder SPS New England Inc. and designer WSP USA Inc. was awarded the winning bid for this Accelerated Bridge Construction (ABC) project in Durham, New Hampshire.  The project consisted of the replacement of an existing 15-foot concrete slab bridge built in 1933 on Route 4 over Bunker Creek, a tidal river.